Cover image for Final draft report : the Battery development guideline study/ prepared for the City of St. John's ; prepared by PHB Group Inc. in association with Tract Consulting Inc., Alvin Simms.
Final draft report : the Battery development guideline study/ prepared for the City of St. John's ; prepared by PHB Group Inc. in association with Tract Consulting Inc., Alvin Simms.
TITLE:
Final draft report : the Battery development guideline study/ prepared for the City of St. John's ; prepared by PHB Group Inc. in association with Tract Consulting Inc., Alvin Simms.
Alternate Title:
Battery, development guideline study
Corporate Author:
Publication Date:
2004
Publication Information:
[St. John's N.L.] : PHB Group Inc.,
Physical Description:
31 leaves, [8] leaves of plates (folded) : ill., maps;
Geographic Term:
Additional Contributors:
Language:
English
General Note:
Cover title.

Includes a notice of a public meeting from the City of St. John's to residents and property owners of the Battery and Signal Hill Road area. Concerning the Battery development guideline study. Date: Tuesday, June 29, 2004. (5 leaves)